iCalendar has ICS injection via unsanitized URI property values
CVE-2026-33635GHSA-pv9c-9mfh-hvxq
What to do
Vendor fix available. Upgrade each affected package to the fixed version on its release line (icalendar 2.12.2), redeploy, then verify what is actually installed.
This page has no inventory attached, so it cannot say whether you are affected. A vendor fix is not proof that your deployment is fixed.
Affected packages
RubyGems icalendar
- Affected
- >= 2.0.0, < 2.12.2
- Fixed in
- 2.12.2
Sources
- GitHub Advisory Database and maintainer security advisories on GitHub
GitHub-reviewed advisory GHSA-pv9c-9mfh-hvxq lists affected ranges: RubyGems icalendar >=2.0.0 <2.12.2
VerifiedObserved Structured GitHub Advisory Database record (type=reviewed) from the GitHub REST API.
Severity and exploitation
- Exploitation
- No confirmed exploitation recorded. Patch Next marks exploitation only from CISA KEV.
- CVSS
- 4.3 · CVSS:3.1/AV:N/AC:L/PR:N/UI:R/S:U/C:N/I:L/A:N
- EPSS
- CVE-2026-33635: 0.25% estimated exploitation activity in the next 30 days; percentile 16.99 (FIRST EPSS, 2026-11-03). This is a model estimate, not proof of exploitation or customer exposure.
Source description
As published by the source; long descriptions are shortened.
Summary .ics serialization does not properly sanitize URI property values, enabling ICS injection through attacker-controlled input, adding arbitrary calendar lines to the output. Details Icalendar::Values::Uri falls back to the raw input string when URI.parse fails and later serializes it with value.tos without removing or escaping \r or \n characters. That value is embedded directly into the final ICS line by the normal serializer, so a payload containing CRLF can terminate the original property and create a new ICS property or component. (It looks like you can inject via url, source, image, organizer, attach, attendee, conference, tzurl because of this) Relevant code: - lib/icalendar/values/uri.rb:16 PoC Run the following with the library loaded: output: Impact Applications that generate .ics files from partially untrusted metadata are impacted. As a result, downstream calendar clients or importers may process attacker-supplied content as if it were legitimate event data, such as…
Dates and revisions
- Published by the source
- Last modified by the source
- Source last checked
- Revision 1 · created ·
Published from ghsa record GHSA-pv9c-9mfh-hvxq
Agent brief
Preview the exact text before you copy it. Commands are read-only suggestions; review them before running anything.
# Patch Next advisory brief: CVE-2026-33635 Advisory: iCalendar has ICS injection via unsanitized URI property values IDs: CVE-2026-33635, GHSA-pv9c-9mfh-hvxq Record: https://patchnext.com/advisories/cve-2026-33635 (revision 1, source checked 26 Oct 2026, 15:51 UTC) Inventory: none attached. This brief comes from a public page and does not say whether any deployment is affected. Severity: Medium (CVSS 4.3) Exploitation: no confirmed exploitation recorded. Patch Next confirms exploitation only from CISA KEV. Vendor response: Vendor fix available; fixed versions by package: icalendar 2.12.2. A vendor fix does not mean a deployment is fixed. ## Affected components - RubyGems icalendar: affected >= 2.0.0, < 2.12.2; fixed in 2.12.2 ## Suggested inspection (read-only) - RubyGems icalendar: check the installed version with your package manager. ## Supported action Upgrade each affected component to a fixed version on its release line. For a transitive dependency, upgrade the parent package or add an override or constraint, then regenerate the lockfile. Redeploy every environment that ran an affected version. ## Required regression checks - Run the test suite and a production build. - Exercise the features that depend on icalendar. - Repeat the inspection and confirm that only fixed versions remain installed. ## Rollback considerations - Keep the previous lockfile and deployment artifact. Rolling back reinstates the vulnerable version, so apply any documented mitigation while you fix forward. ## Unresolved questions - Which deployments run an affected version? - Exploitation status can change. Check again before lowering the priority. - Mark the work resolved only after the fixed version is verified in production. ## Sources - Verified: https://github.com/advisories/GHSA-pv9c-9mfh-hvxq (GitHub-reviewed advisory GHSA-pv9c-9mfh-hvxq lists affected ranges: RubyGems icalendar >=2.0.0 <2.12.2) Commands are suggestions: review each one before running it.
Loading voting…